Skip to content

Filter Options
Text :
Search Criteria :
Territory/Country :
Product Group/Product :
News Type :
My Favorites:
 

Ineos to shut PP, PE plants for maintenance at Lavera site

by ChemOrbis Editorial Team - content@chemorbis.com
  • 03/03/2017 (13:26)
According to a source close to the company, Ineos is planning to conduct a planned maintenance shutdown at its Lavera site in France towards the end of March.

The Lavera site houses a 230.000 tons/year HDPE plant and a 140.000 tons/year PP plant.

The Naphtachimie cracker, which a 50:50 joint venture with Total, will not be affected from the maintenance shutdown, according to the source.
Free Trial
Member Login