Production News: GS Caltex - Northeast Asia - PP | PE
Status: New Capacities (commissioned)
Plant - Product: Ethylene
Capacity ktons/yr: 150.0
Location: Korea (South)
Start Date: 01-12-2024
Notes: Following the scheduled maintenance from September to November, the ethylene capacity of Yeosu cracker will be increased by 150,000 t/y, and propylene capacity by 60,000 t/y. It achieved on-spec production in Nov’24.
Status: New Capacities (commissioned)
Plant - Product: Propylene
Capacity ktons/yr: 60.0
Location: Korea (South)
Start Date: 01-12-2024
Notes: Following the scheduled maintenance from September to November, the ethylene capacity of Yeosu cracker will be increased by 150,000 t/y, and propylene capacity by 60,000 t/y. It achieved on-spec production in Nov’24.
More free plastics news
Plastic resin (PP, LDPE, LLDPE ,HDPE, PVC, GPS; HIPS, PET, ABS) prices, polymer market trends, and more...- Oil roller coaster in July H2 fails to derail most polymer rallies
- Dow’s €1.1 billion claim puts Europe’s ethylene cartel dispute back in focus
- Crude oil surges on renewed war premium; will it reverse the polymer slump?
- EU publishes tariff regulation, swings doors wide open to duty-free US plastics
- Stats: China rewrites PE trade dynamics as April exports explode amid Middle East disruptions
- Role reversal: Iran seeks polymers from Türkiye amid war disruptions
- US PE cracks after record highs; corrections spread from Asia to Europe and Türkiye
- Two months into war: China pressure reverses polymer rally in Asia, early cracks emerge in Türkiye, will Europe follow?
- Polymer rally at pandemic-era highs in just 6 weeks; what happens next?
- Cost of Middle East war for Türkiye: Polymer markets surge to 2021–2022 highs, PE exceeds pandemic-peaks

